Plumbing Quotes
» VIEW ALL JOBS
Plumbing Jobs
PLUMBER Job at PARRAMATTA
1.00 - Each - Supply and install s/s grabrails disabled toilet 1.00 - Each - Supply and install all waste pipework to grease arrestor 1.00 - Each - Supply and install new hotwater system
PLUMBER Job at CARINDALE
- all tap wear including spary airs are to be supplied by the plumber - Hand basin including Tempering valve this includs a white porcelan hand basin supplied by the plumber - Run drainage and waste pipes to sink and basin as required - Cleaners sink including taps and support (wall or legs) Supplied by the plumber - Run gas to nominated points as marked on plans - Gas and water meters? - Allow for gas shut off valve and emergency gas valve? - Supply and install HWU including flow tray and supports - Provide floor waste for vinyl or tile as required - Provide basket trap to all sinks in prep areas and kitchen
PLUMBER Job at CARINDALE
3.00 - Tundish
PLUMBER Job at MELBOURNE
1.00 - Each - 7.02 connect gas griddle plate appliance in front of house kitchen 1.00 - Each - gas disconnection to existing appliances in front of house kitchen area 1 x double deep fryer. 1.00 - Each - 7.01 connect gas 4 burner oven range appliance in front of house kitchen 1.00 - Each - 7.03 connect gas to double fryer appliance in front of house kitchen 3.00 - Each - water disconnecton to existing appliances in front of house kitchen area 1 x dishwasher, 1 x sink, 1 x coffee machine
PLUMBER Job at BELCONNEN
PLUMBER Job at BURNSIDE
- Tap Mixer - single Bowl sink - Under bench hot water system (Zip 10 litre Tudor HWU With Chrome plated sink mixer)
PLUMBER Job at NEWTOWN
- Note: All works to be of a high standard and must comply with B.C.A, Australian Standards and all other relevant regulations. Ensure all approvals are in place prior to construction - Supply and install all fittings, pipes, hot and cold water supply and all drainage as shown on plan - ensure all pipe work is in line with plans, equipment specification (unless otherwise noted as compliant.) and complies with local building code standards. - Supply and install new 50L hot water system - Purge all pipes and fittings on completion - Install cleaners sink and accessories, or mop taps (hot/cold) as per hydraulic plans. - Install hand basin/s and accessories as shown on hydraulic plans - Install wash sink/s and accessories as per hydraulic plans. - Supply and install new pipework to toilet / hand basin if required (PC)


