» VIEW ALL JOB TYPES

Flooring Jobs

FLOORING - VINYL + CARPET Job at DARRA


FLOORING - VINYL + CARPET Job at PARRAMATTA

48.00 - LM - Supply and install FF2 vinyl floor coving (Forbo) F12 rated safeslip 8594. 60.00 - m ^ 2 - Supply and install FF2 vinyl flooring (Forbo) F12 rated safeslip 8594. allow for all self levelling compound and falls to wastes


FLOOR PREPARATION & REMOVAL Job at CARINDALE

- -


FLOORING - VINYL + CARPET Job at CARINDALE

- Flooring installation and coving must comply with AS, drawings and nominated finishes. - NOTE TOP OF COUNTER KICK HAS VINYL ON TOP - Allow for a single skim coat - Supply and install 57lm of vinyl as per plans and finish schedule - Allow to cove plinths and walls as nominated in plans 70lm - Supply and install R12 commercial vinyl to servery area - as per nominated finishes and drawings


FLOORING - TIMBER FLOORS Job at CARINDALE


FLOORING - VINYL + CARPET Job at CARINDALE


FLOOR PREPARATION & REMOVAL Job at MELBOURNE


FLOORING - TIMBER FLOORS Job at MELBOURNE

91.00 - m ^ 2 - Sand and polish parquetry timber floor 91.00 - m ^ 2 - Supply and install parquetry timber flooring in a herringbone pattern (Havwoods) cliplock system colour TBA - including appropriate glue 91.00 - m ^ 2 - Installation of timber parquetry flooring including floor prep - Labour - prep materials (leveling compound)


FLOORING - VINYL + CARPET Job at MELBOURNE


FLOORING - TIMBER FLOORS Job at BURNSIDE

- Ensure that an even 10mm gap is left around the perimeter of the timber floor where it meets walls and corked in colour to match floor. - Install Client supplied timber floor 189mm wide x 20mm thick in 1900 lengths.


FLOORING - VINYL + CARPET Job at BURNSIDE

- Supply and install commercial grade carpet to B.O.H similar in colour to change rooms and corridors - Supply and install stainless steel diminishing strip between transition of different floor finishes and entry to store between mall tile and store tile. - Install client supplied carpet to change rooms and corridors as detailed, ensure that the height of the carpet is the same level as the height of the timber floor, so no noticeable transition between the to floor finishes is noted.


FLOOR PREPARATION & REMOVAL Job at BURNSIDE

- Floor Prep - supply sand and cement toping (approx. 20mm thick) to floor to ensure that all floor finishes are at the same level as the mall tile.

« Prev 1 ... Next »

Tradies Register Here